Secure I.T. Environments designs and installs new 200kW generator unit

Secure I.T. Environments Ltd (SITE) has completed works with Bournemouth, Christchurch and Poole Council (BCP) to design, supply and install a new generator and acoustic housing to support the IT hub for the whole council. SITE also decommissioned the existing generator which had reached the end of its serviceable life.

  • Monday, 22nd January 2024 Posted 2 years ago in by Phil Alsop

A 250kV, 200kW diesel generator, with auto start, battery charging and remote monitoring features. SITE designed an acoustic drop-over canopy cabinet for the generator, which included an internally mounted exhaust and silencer, lowering noise to 75dB(A)@1m in FFC.

Secure I.T. Environments fully installed and tested the generator, as well as providing full training for staff on the new hardware, covering operation, health & safety, and testing. The installation, decommissioning, testing, and switchover were completed in one day with minimum disruption to client services. SITE will provide support for the generator over the warranty period.

Chris Wellfair, Projects Director at Secure I.T. Environments said, “The importance of replacing back-up generators cannot be overstated. Tests and maintenance should be regularly conducted to identify issues, and when a unit reaches the end of its serviceable life the risks of it not providing back-up power when needed are too great. The reputational risks and financial loss of unplanned downtime can take months to recover from.”

The latest TCG specification aims to strengthen device security with post-quantum cryptography...
RSA has unveiled ID Plus Sovereign Deployment, a new identity and access management solution...
Salute has partnered with Ecolab to support AI investments with a Liquid Cooling Operations service.
Schneider Electric collaborates with NVIDIA and AVEVA to develop new reference designs and AI...
OptiCool Technologies has partnered with CoreSite to support cooling solutions in high-density data...
Jacobs introduces a digital twin solution for AI data centres, aiming to enhance planning,...
TE Connectivity introduces its 56G MezzaWave connectors, offering enhanced signal integrity for...
F5 and NVIDIA join forces to enhance AI infrastructures by enhancing token throughput, reducing...