How will data centre infrastructures be affected by the 5G rollout?

The continued growth of the Internet of Things (IOT) depends on ICT infrastructures that can support its data processing and communications bandwidth requirements. Accordingly, 5G, with its ultra-low latency and high transmission rates, has a vital role as an IoT enabler. However, implementing the new standard has major implications for data centres in terms of their size, distribution and internal ICT hardware. In this article, Alex Emms, Operations Director at Kohler Uninterruptible Power (KUP), looks at this data centre evolution, and discusses how modern UPS technology can be deployed to meet the challenges it presents.

Ever since analogue mobile phones first appeared in the early 80s, we’ve become used to a steady evolution of performance and functionality, through 2G, 3G, 4G and their variations.

This evolution has led us to 5G; a concept that is now becoming reality.  Services are already starting to roll out in the UK, US and South Korea, and another 80 operators in 46 countries plan to launch 5G services between now and 2022.

The standard is truly a game-changer because its performance, in terms of speed, latency and connection densities, is such a significant improvement over 4G (or even the ‘4.5G’ technologies, 4G LTE-Advanced and LTE Advanced pro) that it will enable entirely new applications that simply weren’t viable with the earlier standards.

Remote surgery is a good example of this; because a 5G network virtually eliminates the small lag between pinging the network and receiving its response, a surgeon can control a robot arm remotely, without having his precision compromised by feedback delay.

5G could also facilitate driverless cars; the network’s instant response and ubiquitous coverage will allow the cars to use 5G to talk to other cars and sensors built around the city, from street lamps to petrol stations.

Many of these emerging opportunities owe as much to timing as they do to the promise of 5G. Progress in cellular wireless technology has been matched by equally impressive developments in the Internet of Things (IoT) – and the IoT currently comprises sets of geographically distributed smart devices that must communicate, often wirelessly, with a local facility and on to a centralised – typically cloud-based - data processing and analysis resource. So, by giving the IoT wireless channels a step increase in power, 5G will enable a new generation of remote smart devices that reach similarly heightened levels of performance and functionality.

But this new 5G landscape has major implications for the data centres that must handle the data they generate, in terms of performance, capacity, and geographical distribution. Below, we take a closer look at this impact on data centres and their associated power requirements; finally, we show how modern, modular UPS technology can meet this new set of challenges.

Expected 5G impact on data centres

The relationship between 5G and the IoT is highlighted by a Gartner survey[i], in which 57% of respondents reported that their main interest in 5G was to drive IoT communications - and with potentially billions of IoT-connected devices, the amount of data generated will be huge. 5G is estimated to be able to handle 1000 times more connected devices per metre than 4G without being affected by bandwidth congestion, meaning more devices can work in closer proximity. 

Additionally, 5G’s bandwidth and speed - estimated to be between 20 and 100 times faster than 4G - will allow it to compete with ISPs’ traditional broadband wired connections; so creating a further huge demand for data processing and storage capacity, and hence data centres. Data centres will also need to compress data to handle the increase in, for example, video streams. This will require new technologies and compression algorithms.

 

Data centres and telecom providers will therefore require the right high-performance hardware and technology to handle the routing and switching necessary to match the flow of data; additionally, they will need to manage their power consumption. This is not only for cost efficiency, but also due to increasing pressure to demonstrate a greener footprint, and in many cases, the need to avoid upgrading power feeds into the data centre. One solution is installing software defined power (SDP) based on both hardware and software that can skilfully allocate power throughout the data centre, and another is to select more energy efficient equipment; this will save both direct energy costs, and costs associated with keeping the equipment cool.

Data centres that have set up for 4G will have the capacity for handling 5G data. However, they will have to change their infrastructure to cater for 5G’s frequencies. 5G uses short wavelengths, which means small cells rather than large cell towers scattered around the country. These super-high frequencies (30 GHz to 300 GHz) will only work if devices are in close proximity to antennas. Therefore, it is likely we will see multiple input and output antennas (MIMOs) and many more small cells installed around public infrastructure.

Small cells have a clear advantage over traditional cell sites as they can be located in areas which lack space for large cell towers. What’s more, they are cheaper to deploy. Data centres will, however, need to be close enough to these cells to maintain 5G’s low latency performance and meet service-level agreements. In some cases micro data centres might even be deployed at the base of cell towers, allowing limited data processing with even faster response times for critical applications like autonomous vehicles.

These trends will likely lead to the break-up of larger data centres into smaller, more local data centres close to these cells. The new, low latency IoT-type applications such as the above remote surgery and driverless cars examples will clearly depend on data processing, communications channels and power infrastructures that offer very highly reliability alongside ground-breaking performance. This will call for Tier 3 and Tier 4 data centres with near 100% redundancy.

Implications for UPSs

The above predictions for 5G indicate that there will be a proliferation of small and very small data centres - but these data centres, however small, must be just as reliable as the best of their larger counterparts. So how can UPS technology facilitate the scaled-down yet highly-reliable power solutions essential to such environments?

The answer lies with today’s transformerless modular topology, as exemplified by Kohler Uninterruptible Power’s PowerWAVE 8000DPA UPS – See Fig.1. Designed for low to medium-scale high power density applications, the UPS offers high energy efficiency, 99.9999% (‘Six Nines’) availability and flexible scalability in a tower or rack-mountable configuration.

While a single module can be used to deliver 10 kW or 20 kW, further modules can be added incrementally to increase capacity or provide N+1 (or N+n) redundancy. Up to 80kW (60kW N+1) rack-mounting capacity can be provided, with an ultimate capacity of 400kW for two fully-populated tower versions in parallel.

The PowerWAVE 8000DPA’s rack-mounting capability and high power density allows it into restricted spaces,  while its high energy efficiency minimises the heat to be extracted from such spaces. As well as the completely self-contained UPS, each module includes battery and communications capability. This allows monitoring of UPSs in remote data centres from a centralised location.

The system’s Decentralised Parallel Architecture (DPA) means that single points of failure are eliminated, and uptime is maximised. Mean time to repair (MTTR) is minimised, as the modules are ‘hot swappable’ and can be safely removed and replaced without interrupting power to the critical load.





Effective maintenance is essential too

While providing a UPS of suitable size, scalability, efficiency and availability is essential for the new generation of small 5G-oriented data centres, this alone is not enough. To be kept in prime condition and optimally reliable, the UPS, especially its battery, must be regularly monitored and maintained. This can be challenging for an implementation comprising many small data centres distributed over a wide geographical area.

An experienced and well-resourced UPS supplier like Kohler Uninterruptible Power can solve situations like this. Firstly, they offer remote monitoring services including PowerREPORTER Remote UPS Monitoring, and PowerNSURE Battery Monitoring.

PowerNSURE not only provides battery monitoring, but also performs proactive maintenance. It checks every battery’s internal resistance, temperature and voltage, and reports on the results – see Fig.2. Additionally, it executes an equalisation process to keep battery charging voltages within operating range. By preventing gassing, dry-out and thermal runaway, this assures continuous battery availability.

PowerREPORTER communicates constantly with UPS systems, and detects any fault conditions or alarm messages. While customers can monitor all of their UPS systems centrally, any incident is reported to KUP’s Service Centre by email, complete with status and any available details. The Centre’s personnel can pass this information to the field team, allowing them to reach the UPS site within the contracted service agreement time, already briefed on the issue and equipped to resolve it rapidly.

 

KUP’s remote monitoring services are complemented by their nationwide team of trained field engineers. Covering the entire UK, this team not only responds to alarm callouts as described, but also performs scheduled maintenance visits to comply with any established service agreement. Emerging problems are fixed before they can cause failures, so the power protection system’s maximum possible availability is assured.

Conclusion

In recent years, popular news has focused on the drive by organisations like Google and Facebook to build hyperscale data centres. However, the rise of the IoT and expected growth in 5G means that, for many users, the emphasis will shift towards smaller, sometimes micro-scale facilities.

These will call for UPSs that are suitably scaled down, while still offering levels of availability associated with Tier 3 and 4 installations. They must be compact, scalable, simply installed, efficient, and easy to manage remotely.

But it’s not just about providing the right hardware. Critically, the UPS supplier must have the remote monitoring technology and field service infrastructure needed to guarantee that UPSs in multiple facilities spread over a wide geographical area unfailingly achieve their full performance and availability potential.

 

Reference

 


By Stuart Farmer, Sales Director, Mercury Power.
By Nick Bannister, vice president sales for Arrow’s enterprise computing solutions business in...
Here are the top six trends according to Brent Owens, Director Sales & Partner Enablement EMEA for...
By Paul Flannery VP of International Channel Sales at ERP provider, Epicor.
By Chris McKie, VP, Product Marketing Security and Networking, Datto, a Kaseya company.